Alfred Concession Road 7 - Renewable Energy Approval Process
Axio Power Canada Inc./SunEdison Canada are proposing to construct a 10-Megawatt (MW) groundmount solar PV (photovoltaic) project in Alfred and Plantagenet, Ontario. The project is being developed under Ontario’s Feed-in Tariff (FIT) program. As such, the project needs to complete the Renewable Energy Approval (REA) process and receive an REA from the Ministry of the Environment (MOE).
This project was originally being developed by Axio Power. Axio Power merged with SunEdison in 2011 and the project is now continuing under the SunEdison name.
This website has been created to provide interested parties with access to information about the project and the Project Team that is carrying out the Alfred REA study.
Project Location: Rang Saint Jean, near Alfred Township of Alfred and Plantagenet County of Prescott and Russell

Consultation:
Consultation is an integral part of the REA process. Consultation provides opportunities for two-way communication with interested stakeholders. Consultation activities also enable the identification of potential environmental issues early in the decision-making process and ensure that they are given appropriate consideration. The purpose of the consultation program is to provide input to assist the Project Team in making decisions throughout the REA process.
Public meetings are the main forum for public input and two meetings will be held over the course of the study. The meetings are arranged in an open house/drop-in centre format to allow the public to see results, exchange information, and ask one-on-one questions of the Project Team.
Public Meeting #1: Date: Wednesday, September 15, 2010 Time: 6:00 pm to 8:30 pm Format: Drop-In Centre/Open House Location: Alfred Recreation Centre, 555 St. Phillippe Street, Alfred
Public Meeting #2: Date: Monday, November 28, 2011 Time: 5:30 pm to 8:00 pm Format: Drop-In Centre/Open House Location: Alfred Recreation Centre, 555 St. Phillippe Street, Alfred
Project Team Contacts:
Hatch Ltd. is conducting the Alfred REA study on behalf of Axio/SunEdison, the project proponent. If you have any questions or comments related to the study or to be added to the study mailing list, please contact one of the project team members below.
Bruce Bennett Environmental Coordinator Hatch Ltd. 4342 Queen Street, Suite 500 Niagara Falls, ON L2E7J7 Tel: 905-357-6988 Fax: 905-374-1157 Email: bbennett@hatch.ca | Mr. Robert Miller, M.Sc., P.Eng. Director of Development SunEdison Canada 595 Adelaide St. East, Suite 400 Toronto, ON M5A 1N8 Phone: 613-545-0215 Email: rmiller@sunedison.com | REA Documents and Relevant Links:
Study documents and relevant links are provided below.
Note: Several of the (Hatch) documents posted on this web page are identified as ‘Draft’. Persons reviewing these documents should consider them as Final.
 |
| Relevant Documents |
|
1. Notice of a Proposal and Public Meeting #1_Aug 13, 2010 |
|
|
2. Public Information Meeting #1 Panels_Aug 13, 2010 (English) |
|
|
3. Public Information Meeting #1 Panels_Aug 13, 2010 (French) |
|
|
4. Notice of Public Meeting 2 - 28 Nov 2011 (English) |
|
|
5. Notice of Public Meeting 2 - 28 Nov 2011 (French) |
|
|
6. Executive Summary Report_Rev. D_Sept 21, 2011 |
|
|
7. Project Description Report_Rev. 4_Sept 21, 2011 |
|
|
8. Construction Plan Report_Rev. E_Sept 21, 2011 (6 MB) |
|
|
9. Design and Operations Report_Rev. E_Sept 21, 2011 (10 MB) |
|
|
10. Decommissioning Plan Report_Rev. E_Sept 21, 2011 |
|
|
11. Site Plan_September 19, 2011 (5 MB) |
|
|
12. Noise Study Report_Rev. E_Sept 21, 2011 (7 MB) |
|
|
13. Alfred MOE Noise Tables_February 2012 |
|
|
14. Water Body Records Review Report_Rev. G_Sept 19, 2011 |
|
|
15. Water Body Site Investigation Report_Rev F_Sept 19, 2011 (9 MB) |
|
|
16. Water Body Environmental Impact Study_Rev F_Sept 19, 2011 (13 MB) |
|
|
17. Natural Heritage Assessment Records Review Report_Rev. J_Aug 22, 2011 |
|
|
18. Natural Heritage Assessment Site Investigation Report_Rev I_Aug 22, 2011 (5 MB) |
|
|
19. Natural Heritage Assessment Evaluation of Significance Report_Rev I_Aug 22, 2011 |
|
|
20. Natural Heritage Assessment Environmental Impact Study Report_Rev J_Sept 21, 2011 |
|
|
21. Ministry of Natural Resources (MNR) Letter of Confirmation_ Aug 26, 2011 |
|
|
22. Stage 1 & 2 Archaeological Assessment Report_Aug 2010 |
|
|
23. Ministry of Tourism and Culture (MTC) Comment Letter_Nov 22, 2010 |
|
|
24. Traffic Impact Study Report_June 20, 2011 (2 MB) |
|
|
25. Conceptual Stormwater Management Report_July 27, 2011 |
|
|
26. Groundwater Monitoring Scoping Report_Aug 2011 (6 MB) |
|
|
27. Public Information Meeting #2 Panels_Nov. 28, 2011 (English) |
|
|
28. Public Information Meeting #2 Panels_Nov. 28, 2011 (French) |
|
|
29. MNR Acceptance of Change of Technology |
|
|
30. Consultation Report_Feb 29, 2012 |
|
|
31. Alfred Consultation Appendix_April 23, 2012 |
|
|
32. Alfred Soil Classification Map |
|
|
 |
 |
 |
 |
 |
 |
|