Kingston Gardiner Highway 2 South - Renewable Energy Approval Process
Axio Power Canada Inc./SunEdison Canada are proposing to construct a 10-Megawatt (MW) groundmount solar PV (photovoltaic) project near Odessa, in the Township of Loyalist, Ontario. The project is being developed under Ontario’s Feed-in Tariff (FIT) program. As such, the project needs to complete the Renewable Energy Approval (REA) process and receive an REA from the Ministry of the Environment (MOE).
This project was originally being developed by Axio Power. Axio Power merged with SunEdison in 2011 and the project is now continuing under the SunEdison name.
This website has been created to provide interested parties with access to information about the project and the Project Team that is carrying out the Highway 2 South REA study.
Project Location: Part of Lot 40, Concession 3 County Road 2 Township of Loyalist County of Lennox and Addington, Ontario

Consultation:
Consultation is an integral part of the REA process. Consultation provides opportunities for two-way communication with interested stakeholders. Consultation activities also enable the identification of potential environmental issues early in the decision-making process and ensure that they are given appropriate consideration. The purpose of the consultation program is to provide input to assist the Project Team in making decisions throughout the REA process.
Public meetings are the main forum for public input and two meetings will be held over the course of the study. The meetings are arranged in an open house/drop-in centre format to allow the public to see results, exchange information, and ask one-on-one questions of the Project Team.
Public Meeting #1: Date: Thursday, September 9, 2010 Time: 5:30 pm to 8:30 pm Format: Drop-In Centre/Open House Location: Odessa Fairgrounds (Old Palace), 231 Main Street South, Odessa, ON
Public Meeting #2: Date: Wednesday, November 9, 2011 Time: 5:30 pm to 8:00 pm Format: Drop-In Centre/Open House Location: Odessa Fairgrounds (Old Palace), 231 Main Street South, Odessa, ON
Project Team Contacts
Hatch Ltd. is conducting the Highway 2 South REA study on behalf of Axio/SunEdison, the project proponent. If you have any questions or comments related to the study or to be added to the study mailing list, please contact one of the project team members below.
Bruce Bennett Environmental Coordinator Hatch Ltd. 4342 Queen Street, Suite 500 Niagara Falls, ON L2E7J7 Tel: 905-357-6988 Fax: 905-374-1157 Email: bbennett@hatch.ca | Mr. Robert Miller, M.Sc., P.Eng. Director of Development SunEdison Canada 595 Adelaide St. East, Suite 400 Toronto, ON M5A 1N8 Phone: 613-545-0215 Email: rmiller@sunedison.com |
REA Documents and Relevant Links:
Study documents and relevant links are provided below.
 |
| Relevant Documents |
|
1. Notice of a Proposal and Public Meeting #1_July 27, 2010 |
|
|
2. Public Information Meeting #1 Panels_September 9, 2010 |
|
|
3. Notice of Public Meeting 2 - September 10, 2011 |
|
|
4. Executive Summary Report_Rev. D_Aug 29, 2011 |
|
|
5. Project Description Report_Rev. 3_Aug 29, 2011 |
|
|
6. Construction Plan Report_Rev. D_Aug 29, 2011 (7 MB) |
|
|
7. Design and Operations Report_Rev. D_Aug 29, 2011 (11 MB) |
|
|
8. Decommissioning Plan Report_Rev. D_Aug 29, 2011 |
|
|
9. Site Plan_August 18, 2011 (5 MB) |
|
|
10. Noise Study Report_Rev. 0_Jan 26, 2012 (4 MB) |
|
|
11. Water Body Records Review Report_Rev. D_Aug 17, 2011 (4 MB) |
|
|
12. Water Body Site Investigation Report_July 18, 2011 |
|
|
13. Natural Heritage Assessment Records Review Report_Rev. F_July 15, 2011 |
|
|
14. Natural Heritage Assessment Site Investigation Report_July 5, 2011 (6 MB) |
|
|
15. Natural Heritage Assessment Evaluation of Significance Report_July 12, 2011 |
|
|
16. Natural Heritage Assessment Environmental Impact Study Report_July 14, 2011 (7 MB) |
|
|
17. Ministry of Natural Resources (MNR) Letter of Confirmation_ Aug 2, 2011 |
|
|
18. Stage 1 & 2 Archaeological Assessment Report_Aug 2010 |
|
|
19. Ministry of Tourism and Culture (MTC) Letter of Confirmation_Nov. 22, 2010 |
|
|
20. Traffic Impact Study Report_July 2011 (7 MB) |
|
|
21. Conceptual Stormwater Management Report_July 27, 2011 |
|
|
22. Groundwater Monitoring Scoping Report_Aug 2011 |
|
|
23. Public Information Meeting #2 Panels_Nov. 9, 2011 |
|
|
24. Consultation Report (17 MB) |
|
|
 |
 |
 |
 |
 |
 |
|