Highway 2 South
Kingston Gardiner Highway 2 South - Renewable Energy Approval Process

Axio Power Canada Inc./SunEdison Canada are proposing to construct a 10-Megawatt (MW) groundmount solar PV (photovoltaic) project near Odessa, in the Township of Loyalist, Ontario. The project is being developed under Ontario’s Feed-in Tariff (FIT) program. As such, the project needs to complete the Renewable Energy Approval (REA) process and receive an REA from the Ministry of the Environment (MOE).

This project was originally being developed by Axio Power. Axio Power merged with SunEdison in 2011 and the project is now continuing under the SunEdison name.

This website has been created to provide interested parties with access to information about the project and the Project Team that is carrying out the Highway 2 South REA study.

Project Location:
Part of Lot 40, Concession 3
County Road 2
Township of Loyalist
County of Lennox and Addington, Ontario



Consultation:

Consultation is an integral part of the REA process. Consultation provides opportunities for two-way communication with interested stakeholders. Consultation activities also enable the identification of potential environmental issues early in the decision-making process and ensure that they are given appropriate consideration. The purpose of the consultation program is to provide input to assist the Project Team in making decisions throughout the REA process.

Public meetings are the main forum for public input and two meetings will be held over the course of the study. The meetings are arranged in an open house/drop-in centre format to allow the public to see results, exchange information, and ask one-on-one questions of the Project Team.

Public Meeting #1:

Date: Thursday, September 9, 2010
Time: 5:30 pm to 8:30 pm
Format: Drop-In Centre/Open House
Location: Odessa Fairgrounds (Old Palace), 231 Main Street South, Odessa, ON

Public Meeting #2:
Date: Wednesday, November 9, 2011
Time: 5:30 pm to 8:00 pm
Format: Drop-In Centre/Open House
Location: Odessa Fairgrounds (Old Palace), 231 Main Street South, Odessa, ON

Project Team Contacts

Hatch Ltd. is conducting the Highway 2 South REA study on behalf of Axio/SunEdison, the project proponent. If you have any questions or comments related to the study or to be added to the study mailing list, please contact one of the project team members below.

Bruce Bennett
Environmental Coordinator
Hatch Ltd.
4342 Queen Street, Suite 500
Niagara Falls, ON L2E7J7
Tel: 905-357-6988
Fax: 905-374-1157
Email: bbennett@hatch.ca
Mr. Robert Miller, M.Sc., P.Eng.
Director of Development
SunEdison Canada
595 Adelaide St. East, Suite 400
Toronto, ON M5A 1N8
Phone: 613-545-0215
Email: rmiller@sunedison.com
 

REA Documents and Relevant Links:


Study documents and relevant links are provided below.
Relevant Documents
1.  Notice of a Proposal and Public Meeting #1_July 27, 2010
2.  Public Information Meeting #1 Panels_September 9, 2010
3.  Notice of Public Meeting 2 - September 10, 2011
4.  Executive Summary Report_Rev. D_Aug 29, 2011
5.  Project Description Report_Rev. 3_Aug 29, 2011
6.  Construction Plan Report_Rev. D_Aug 29, 2011 (7 MB)
7.  Design and Operations Report_Rev. D_Aug 29, 2011 (11 MB)
8.  Decommissioning Plan Report_Rev. D_Aug 29, 2011
9.  Site Plan_August 18, 2011 (5 MB)
10.  Noise Study Report_Rev. 0_Jan 26, 2012 (4 MB)
11.  Water Body Records Review Report_Rev. D_Aug 17, 2011 (4 MB)
12.  Water Body Site Investigation Report_July 18, 2011
13.  Natural Heritage Assessment Records Review Report_Rev. F_July 15, 2011
14.  Natural Heritage Assessment Site Investigation Report_July 5, 2011 (6 MB)
15.  Natural Heritage Assessment Evaluation of Significance Report_July 12, 2011
16.  Natural Heritage Assessment Environmental Impact Study Report_July 14, 2011 (7 MB)
17.  Ministry of Natural Resources (MNR) Letter of Confirmation_ Aug 2, 2011
18.  Stage 1 & 2 Archaeological Assessment Report_Aug 2010
19.  Ministry of Tourism and Culture (MTC) Letter of Confirmation_Nov. 22, 2010
20.  Traffic Impact Study Report_July 2011 (7 MB)
21.  Conceptual Stormwater Management Report_July 27, 2011
22.  Groundwater Monitoring Scoping Report_Aug 2011
23.  Public Information Meeting #2 Panels_Nov. 9, 2011
24.  Consultation Report (17 MB)


©2012 SunEdison   |    Home   |    An MEMC Company   |    Contact Us   |    Privacy Policy   |    Legal Disclaimer   |    Sitemap